Consultancy Agreements And Works Contracts

Consultants

AECOM - Halcrow Joint Venture

Agreement Title
First Phase Development of the New Territories North – San Tin / Lok Ma Chau Development Node – Package 1 – Design and Construction
Agreement No.
CE 15/2023 (CE)

Arup - Binnies Joint Venture

Agreement Title
First Phase Development of the New Territories North – San Tin / Lok Ma Chau Development Node – Package 2 – Design and Construction
Agreement No.
CE 16/2023 (CE)

AECOM - AtkinsRealis Joint Venture

Agreement Title
First Phase Development of the New Territories North – San Tin / Lok Ma Chau Development Node – Package 3 – Design and Construction
Agreement No.
CE 19/2024 (CE)

Contract No.: ND/2024/09

San Tin Technopole Phase 1 Stage 1 (West) – Contract 1 – Site Formation and Associated Works

Description :

The works mainly comprise:

  1. site formation of lands (including site clearance) and ground investigation works;
  2. land decontamination works;
  3. archaeological survey;
  4. diversion works of existing roads, cycle tracks, drainage, sewerage, water supply and utilities systems; and
  5. implementation of environmental mitigation measures and environmental monitoring works for the works mentioned above.
Commencement Date:Dec 2024
Completion Date:2027 (Anticipated)
Contract Sum:$359.23 million
Contractor:CR15G-Tung Lee Joint Venture
Contract No.: ND/2024/10

San Tin Technopole Phase 1 Stage 1 (East) – Contract 1 – Site Formation and Engineering Infrastructure Works

Description :

The works mainly comprise:

  1. site formation of lands (including site clearance) and ground investigation works;
  2. construction of at-grade Road L27 connecting to Lok Ma Chau Road;
  3. construction of associated works including footpaths, drainage (including construction of box culverts), sewerage, water mains, landscaping works and slope works; and
  4. implementation of environmental mitigation measures and environmental monitoring works for the works mentioned above.
Commencement Date:Dec 2024
Completion Date:2028 (Anticipated)
Contract Sum:$228.64 million
Contractor:Kuly Construction &
Engineering Company Limited