Consultants
AECOM - Halcrow Joint Venture
Agreement Title
First Phase Development of the New Territories North – San Tin / Lok Ma Chau Development Node – Package 1 – Design and Construction
Agreement No.
CE 15/2023 (CE)
Arup - Binnies Joint Venture
Agreement Title
First Phase Development of the New Territories North – San Tin / Lok Ma Chau Development Node – Package 2 – Design and Construction
Agreement No.
CE 16/2023 (CE)
AECOM - AtkinsRealis Joint Venture
Agreement Title
First Phase Development of the New Territories North – San Tin / Lok Ma Chau Development Node – Package 3 – Design and Construction
Agreement No.
CE 19/2024 (CE)
Contract No.: ND/2024/09
San Tin Technopole Phase 1 Stage 1 (West) – Contract 1 – Site Formation and Associated Works
Description :
The works mainly comprise:
- site formation of lands (including site clearance) and ground investigation works;
- land decontamination works;
- archaeological survey;
- diversion works of existing roads, cycle tracks, drainage, sewerage, water supply and utilities systems; and
- implementation of environmental mitigation measures and environmental monitoring works for the works mentioned above.
| Commencement Date | : | Dec 2024 |
| Completion Date | : | 2027 (Anticipated) |
| Contract Sum | : | $359.23 million |
| Contractor | : | CR15G-Tung Lee Joint Venture |
Contract No.: ND/2024/10
San Tin Technopole Phase 1 Stage 1 (East) – Contract 1 – Site Formation and Engineering Infrastructure Works
Description :
The works mainly comprise:
- site formation of lands (including site clearance) and ground investigation works;
- construction of at-grade Road L27 connecting to Lok Ma Chau Road;
- construction of associated works including footpaths, drainage (including construction of box culverts), sewerage, water mains, landscaping works and slope works; and
- implementation of environmental mitigation measures and environmental monitoring works for the works mentioned above.
| Commencement Date | : | Dec 2024 |
| Completion Date | : | 2028 (Anticipated) |
| Contract Sum | : | $228.64 million |
| Contractor | : | Kuly Construction & Engineering Company Limited |
Contract No.: ND/2025/01
San Tin Technopole Phase 1 Stage 1 (East) – Contract 2 – Site Formation and Engineering Infrastructure Works
Description :
The works mainly comprise:
- site formation of lands (including site clearance) and ground investigation works;
- construction of at-grade roads (i.e. Roads L18, L19, L20 and L21) connecting to Lok Ma Chau Road, Castle Peak Road – Chau Tau and Kwu Tung Road;
- construction of a sewage pumping station;
- construction of associated works including cycle tracks, footpaths, drainage (including construction of box culverts), sewerage, water mains (including section of the DN1000 freshwater trunk main connecting the Sheung Shui Water Treatment Works and the proposed fresh water service reservoir in San Tin), landscaping and slope works; and
- implementation of environment mitigation measures and environmental monitoring works for the works mentioned above.
| Commencement Date | : | Feb 2026 |
| Completion Date | : | 2031 (Anticipated) |
| Contract Sum | : | $2,266.91million |
| Contractor | : | CRBC - MAYLON Joint Venture |